Up Men's Work Trip to Zephyr, September 2009 Prev Next Slideshow

 Previous image  Next image  Index page
DSC_0057
DSC_0059
DSC_0062
DSC_0063
DSC_0065
  DSC_0071.JPG - David pauses as installation of High Deck flooring begins.  Note how it runs at a 45 degree angle to the joists, to increase structural strength.  
DSC_0076
DSC_0084
DSC_0087
DSC_0008
DSC_0102

DSC 0071 | David pauses as installation of High Deck flooring begins. Note how it runs at a 45 degree angle to the joists, to increase structural strength. Download
« | < | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Camera: NIKON D50 | Date: 9/12/09 1:57 PM | Resolution: 3000 x 2000 | Exp. Time: 1/125s | Aperture: 5.6 | Focal Length: 45.0mm (=69mm)
Total images: 45 | Last update: 1/22/10 9:51 AM | Help